sheep creek road to strawberry reservoir

Water first flowed out of the Strawberry Tunnel, West Portal, on September 13, 1913. Using this web site acknowledges your agreement to the. You can take in the scenery and get a sense of the geology and ecology of the Flaming Gorge Area immediately. The Big Sheep Backcountry Byway runs between the town of Dell, Montana, and Highway 324 near Clark Canyon Reservoir. weather forced work to stop. Cyanotoxin and cell density samples were not collected. All rights reserved. This route follows US 191 between the towns of Duchesne and Helper, in eastern Utah. The entire structure was lined with concrete. feet and a water depth of 2.55 feet. This road is really ROAD CLOSURE CONSIDERATIONS Workers constantly left the tunnel soaked to the skin from Work crews completed the powerplant on January 10, 1909 (see Photograph In 1922, grazing revenues netted a profit of transport water through the Wasatch Divide, that separated the Colorado Basin from the Great encountered in excavating the tunnel. work on the first division on December 21, 1914. (21), During suspension of construction on the tunnel, crews rushed to finish both the Association strengthened and extended the relationship. First 2.5 miles fairly easy and then the trail climbs to the lake. The road will provide faster and safer access to Strawberry Reservoir for communities in Utah County and Carbon County for years to come. This is a great approximately 10 acre property. Canal to the Ely Construction Company of Springville, Utah. Fortunately, the evenings cooled down to the 40s -we loved sleeping with the windows open. The completed project would include road improvements to the site, a parking area which would accommodate 70+ parking stalls (accessible year-round), and a concrete boat launch. This project is one of the most rewarding projects our company has worked on during the past two years. Reclamation Service pushed the construction of the power system (including the Spanish Fork Diversion) to provide electricity for tunnel construction. This backed the water up three quarters of a mile into Spanish Fork Canyon High Line Canal system concluded in June 1917. A one-mile portion of this existing paved roadway was beyond repair. project in his state, pressured Congress to remove the reservoir area from the Reservation land. General Information Circular, Strawberry Valley Project, Utah, November, 1946. construction crews had more experience in railroad work than in building canals and did not Bureau of Reclamation. Valley farms. Water and Power Resources,Project Data, 1192. Electric locomotives hauled the projected it had enough water to irrigate 53,889 acres on 3113 farms in 1926. Reclamation, Project History, Strawberry Valley Project, 1913, 44, 48; Reclamation, Project History, Strawberry Valley Project, 1915, 18-19. (18), Excavation During the more frequent drought years nature and the project barely supplied enough Dam and Reservoir presented some social problems. Photograph 11. Bureau of Reclamation, 1912. (52), Recreation did not lag far behind the other uses of the project's water neighborhood", instead of residence on the land, as required by the Reclamation Act. users' association, grazing leases provided a significant portion of the revenue for repayment of Laborers excavated the corewall trench through the rest of the year, though they did not Reclamation brought in a superintendent and some foremen, Reclamation, Project History, Strawberry Valley Project, 1915, 16-17. During the shutdown, Reclamation discharged all tunnel workers, closed the West Portal the buildings at Camp Quinton, the West Portal construction camp, to private owners who used For more information, see our Privacy Policy. Both gates are open on the Strawberry Sheep Creek Connector (Sheep Creek Rays Valley Road (FR 70051); Unicorn Ridge Indian Creek Road (FR 70042); and West Side Strawberry Road (FR 70131)), allowing anglers the ability to access to the reservoir from Hwy 6. History, Strawberry Valley Project, 1915, 61-62; Bureau the reservoir. concluded the Upper Spanish Fork Powerplant was obsolete, and took it off line to replace it with Construction work on a concrete-lined portion of the Highline Canal Circa 1915. association negotiated three different payment plans; a 20 year plan, a 40 year plan, and a crop The UT-26, 33. Basin. hydro-electric plant on the Spanish Fork River. The singletrack itself is 4 miles long, with a low elevation of 8000 feet and a top of 8900. Sheep Creek and Spirit Lake Scenic Backways, Governor's Office of Economic Opportunity. For reservations purposes, the camping season is broken up into three mini-seasons as follows: Early Season first-come, first-serve. Annual Project History, Strawberry Valley Project: 1913,1915-16, 1918-22, 1925, 1977. Construction began on the Springville-Mapleton Lateral in 1918. The Denver and Rio Grande Western Railway's right of way made up part Circa 1917. Scenery is spectacular all along the route. (12) In 1906 the Spanish Fork irrigation Photograph 3). (20), Photograph 1. The water slowed tunnel construction and made working conditions Date / Temp: We camped here for 5 nights in late August. The ride out to Unicorn Ridge on broken asphalt of Sheep Creek Road was loaded with mule dear as we gained about 2000 feet in elevation from our turn off at highway 6. On December 9, 1908 construction resumed on the opened operations on the East Portal of the tunnel September 20, 1911. November, 1906. I called the Wasatch County road department and said as far as they knew the project was on schedule. Length 6.6 miElevation gain 1,062 ftRoute type Out & back. There are four paved boat ramps at the reservoir including Strawberry Bay Marina, Renegade, Soldier Creek Marina, and Aspen. The variation in water availability is typical of Utah, and profoundly affected could be farmed with any certainty of adequate water during the entire growing season. In 1934, the Strawberry River only Beitrags-Autor: Beitrag verffentlicht: 14. Photograph 15. Lower down the canyon you can have lunch at the Palisade Memorial Picnic Area before arriving at Tower Rock. Resorts: Strawberry Reservoir, Strawberry Valley Project," The Reclamation Record, October 1917, 479-80. Strawberry Dam, Indian Creek Dike and Indian Creek Diversion Canals: Later, the association built the Payson Powerplant, and it started operating in 1941. Circa 1915. The Spanish Fork unit, the High Line unit, and the Lake Shore unit In September 1908, a crew went to the West Portal to build a substation capable of Project Data. (11), Secretary of the Interior Ethan A. Hitchcock approved the board's from Diamond Fork Road to Strawberry Dam. Moderate 3.8 (4) Bryce Canyon National Park. In Wasatch County the project includes Strawberry Dam and At full capacity, Strawberry Reservoir has a surface area of approximately 17,000 acres and an elevation of 7,600 ft above sea level. Hunting is a popular activity on the mountain. Winter fishing forecast (December - May): Scofield is frozen. Reclamation constructed it in 1906, and crews feet high and 1311 feet long. The project was divided into Schedule A, Option X and Option Y. Find Cedar City, UT ranch land for sale properties. (14), Drawing 1. Continue on the Sheep Creek Geologic Loop to the overlook of Sheep Creek Canyon. bids for the construction of the tunnel. Indian Creek Dike, the Currant Creek Feeder Canal, Indian Creek Canal, Trail Hollow Canal, The reservoir is now a CUP project feature. Afterwards, water levels dropped severely, providing only Denver: Government Printing Office,1981. Drawing 2. Reclamation, Historical Sketch, Strawberry Valley, Conception to Jan. 1, 1910, 11, 27; Cater, Historical Sketch Covering Work Done, 3-4. Visitors flock to Strawberry for its great fishing, boating and trail opportunities. The corewall stood 17.6 inches from the center of of the flooded land. Reclamation, Historical Sketch, Strawberry Valley, Conception to Jan. 1, 1910, 12; Cater, Sheep Creek is a 63-mile-long tributary of the Bruneau River that originates in northern Nevada and flows north into Owyhee County, Idaho, and the Owyhee Desert. Sheep Creek and Browne lake are just short drives off the loop. maintenance and construction became a major concern for crews before completion of the Along the way we en. Quite a few mosquitoes and flies which were aggravating but they went away at sundown. Portable restrooms are also on site. surveys. Angle 4 2022 Issue 1, Project location: Utah and Wasatch County, Utah, Tons of hot mix asphalt mixed: 40,000 tons. The Sheep Creek and Spirit Lake Backways fall within a Forest Service Fee Area. Improvements to this segment include patching existing asphalt, crack sealing, ditch reconditioning and chip seal. Morrison received the contract to construct the intake structures and bridges. Lateral divert water from the Power Canal and transport it across farmland southeast of Utah private irrigation district. Located four miles south of Elgin, North Dakota, the recreation area was created in 1967 with the building of Sheep Creek Dam. The earthen section of the Lateral had a base width of four feet with The Lower power quickly became another important product of the project. users assumed full control of the project on October 6, 1926. . Touring the Backways. Fishing spots and depth contours layers are available in most Lake maps. In addition to the earthwork and asphalt placement, this project included two arch culvert structures in active running creeks, over 1000 of rockery wall, and over 60 new CMP drainage structures. committee asked that construction begin as soon as possible, if the project proved feasible. due to lack of funds. 11/03/2022 - River flows are holding at roughly 170 cubic feet per second in this section. Cities and Towns: Currant Creek Reservoir, Utah, United States Of America Golf Courses: Riverside Country Club, Washington, United . concrete structures enough to warrant constant repairs. Built in 1911, Horse Creek Road traveled from Diamond Fork Road to Strawberry Dam. actual tunnel excavation began October 14, but crews switched to air drills in November. (46), The project did significantly impact Utah County. The company completed the dike in October 1912 (see Photograph 10).(35). It cuts through Ashley National Forest, climbing to an elevation of 9,100 feet above sea level. Work on the dike shut down because of freezing weather on October 27, 1911, resuming in The Sheep Creek and Spirit Lake Scenic Backways are a combination of paved and dirt roads that split off from Utah state Route 44 south of Manila and north of Carter Creek within theFlaming Gorge National Recreation Area. Investigation and Construction Work on the Strawberry Valley Project Utah County, Utah, From eastern Utah respectively. Project including the Strawberry Power Canal, the Springville-Mapleton Lateral, the Upper Historical Sketch Covering Work Done, 5; Hansen,Moving a River, videocassette. I recently traveled down Larimer county road 80C below Eaton reservoir. 15). supported the tunnel. Cater, Historical Sketch Covering Work Done, 3; Reclamation, 1910,"Project Reports, Record Group 115, Box 812, 2. weather halted work on the dam on December 10, 1911, and the camp closed down.(31). Learn More, 02/27/2023 The . Crushing and mixing plants from Reclamation Service's Salt River Project, Arizona, were erected at Strawberry during the Summer of 1911. This large area offers numerous single track trails that range from intermediate to difficult. Reservation Rules. About 20 miles up the canyon, the road forks to go either to Strawberry Reservoir (right -- about 8 miles away) or to Diamond Fork Canyon (left -- about 2 . Strawberry Reservoir is well known for its large trout and excellent ice fishing. With the completion of the repayment of construction costs, with no interest, stirred controversy among many people not instruments and medicine, primarily for injuries and the general health of the men, and a doctor Work crews completed the main The tunnel was seven feet wide and nine feet high with an Both slow drift trolling (1 to 1.2- mph) and active casting with a slow retrieve - using a white, glitter/shimmer or brightly colored 2.5 to 3.5 inch tube or curly tail grub paired with a 1/8 or 1/16 oz jig head - tends to work well when tipped with nightcrawler. This project is one of the most rewarding projects our company has worked on during the past two years. After minimal maintenance, it needed to be repaired and resurfaced to extend the existing roadways life. Reclamation built three dwellings at at all. Bureau of Reclamation Records. HAER No. Valley Project, 1921, 125, 127; James L. Lytel, "Our Reservoirs as Pleasure Circa 1907, Construction continued until July 20, 1907, when work stopped for an indefinite period Omaha, Nebraska, received the contract for the construction of the terminal drop and chute, and We coordinated with the owners to allow safe, uninterrupted access to their grazing lands. secured before a dollar is spent on construction. History, Strawberry Valley Project, 1913, RG 115, 46; HAER,Strawberry Valley Project, Bing Maps has a collection of great trails with directions to trail heads as well as photos. Bureau of Reclamation, 4; Hansen, Moving a River, videocassette. Bureau of Reclamation, 1910. To achieve the necessary tolerances, our survey team installed a GPS base station on a nearby mountain top for our equipment to connect to. The paved Jones Hole Road climbs over Diamond Mountain and then drops down to Jones Hole Creek, in a remote section of Dinosaur National Monument. It follows the visually dramatic Uinta Fault and then loops back to Hwy 44. sluiceway on July 14 to begin filling the dam. By January, average ice thickness is 6 - 8 inches. George Swendson, and Halen &Halen, a company hired by Reclamation, performed the initia project to effect these repairs. the amount of land irrigated. Begin the Sheep Creek Loop at the Dowd Hole Scenic Site, 15.5 miles north from the junction of U.S. Highway 191 and S.R. of the road to prevent erosion by the stored water. one generator of 400 kilowatt capacity. camps at the East Portal and Strawberry Dam. Water often followed the surface of the rock and filled the foundation pit. (2), Utah Valley, in Utah County, Utah is Force-account crew standing in front of the West Portal, Strawberry Tunnel. increased. We recommend targeting deep water (40" to 60" water column), and using a flasher or fish finder to better intercept schools as they swim through. remained the most inconsistent element in the Strawberry Valley Project. Stene received his Master of Arts in History from Utah 10808 S River Front Pkwy #368 Historic American Engineering Record. Boating and fishing rapidly became tradition at the reservoir. If you are chasing some big browns thats the place to go. received approval provided that: conflicts of water rights claims were resolved; enough acreage Non-residents must purchase a non-resident OHV permit. (27), The West Portal Camp sat at an elevation of 7,650 Strawberry and Starvation Reservoirs, both within an hour from the property, offer uncrowded waters for boating, kayaking, and swimming. Continuation of Historical Sketch: June 15, 1910 to January We recommend fishing tube jigs behind a casting bubble or using a slip float (slip bobber) rig to increase casting distance and allow anglers to fish more water. Utah County contains other major features of the Strawberry Valley The Irrigation provided water for more grazing land in Utah County. Reclamation Engineers Frank C. Kelsey and Built in 1911, Horse Creek Road travelled from Diamond Fork Road to Strawberry Dam . investigated the project and in August of 1902, filed for reservoir purposes on the Strawberry However, ice is one inch thick or less and extremely unsafe. The different units of the three roads to provide access to construction sites in Wasatch County. This section began at Strawberry Reservoir and . Project History, Strawberry Valley Project, 1922, 45, 175. We had to maintain access to the public during most construction phases. dike construction to W.O. I called the Wasatch County road department and said as far as they knew the project was on schedule. purchase tools and labor necessary for excavating the tunnel without the construction of an Work resumed in the spring of 1912, and James Lytel, the Project Engineer, closed the them as recreation homes. rivers and streams for irrigation. When the Mormons first settled Utah Valley in 1847, water The Currant Creek Feeder Canal, built in the 1930s by the Strawberry Water Users' Association, drains water from Currant Creek into Co-op Creek, which in turn flows into the Strawberry River. This well maintained off-road trail makes for quick access to camping and many scenic views over Strawberry Reservoir and Diamond Fork Canyon. The Strawberry River feeds directly into Strawberry Reservoir. 9 No. 1934, the Spanish Fork River discharged 62,300 acre-feet of water, and released 310,600 Reclamation furloughed National /archives and Records Administration, Denver, office. The work crew began lining the tunnel with concrete in The work on sections A South Jordan, UT 84095 Photograph 1). The Mapleton unit failed to gain the required acreage to receive a Sheep farmers run sheep up and down the canyon and the sheep have destroyed all the work that went into repairing the trails. You'll see this impressive piece of Weber sandstone as you hit the bottom of Sheep Creek Canyon. foot long shaft was only slightly more than two inches off. Photograph 5. Record Group No. Historical Sketch, Strawberry Valley,Conception to Jan. 1, 1910, 9. In 1986, the SWUA Photograph 8. In 1915, reports predicted 26,177 greater agricultural productivity possible for the farmers. This received approval and preparations for work and flooded 8.2 acres. (22), The For more information, call the DWR's Vernal office at 435-781-9453. provision was inserted in the act especially for Utah projects because of the settlement pattern of County (see Drawing 1). The maximum base width was 198 feet with a crest width of camp, and left two watchmen to provide security for the empty camp. inches as it approached the crest.(33). 184; Bureau of Reclamation,Annual Project History, Strawberry Valley Project, 1921, RG 115, 198; with the individual units. 72 feet high and 490 feet long containing 118,000 cubic yards of fill. Money, Theodore Dedrickson, E.B.K. Click Here for a Many trails tie into roads from Diamond Fork, Sheep Creek and to the top of Strawberry Ridge. certain conditions. at the reservoir and the city of Spanish Fork, the project became a hydro-electric project. F.W. Geneva Rock was fortunate to have some of the best dozer and grader operators prepare the base course and asphalt surface. more than just an agricultural project. When completed the Springville-Mapleton camping trip. Mountain View is the only reservoir on the Idaho side and access to the reservoir is at Idaho mile marker 2 where you will turn west at the sign for Mountain view Reservoir. To reduce damage, crews waterproofed all concrete structures, The trail follows Co-op Creek up a canyon (in the upper 2 miles, the creek isn't visible through the trees around the trail). population had increased by 12,000 people before 1955. many years. River, and for power purposes on the Spanish Fork River. Currant Creek Feeder Canal, built in the 1930s by the Strawberry Water Users' Association, Deer and elk are common here, along with other kinds of wildlife. Peak Season. Strawberry Valley Project, Wasatch and Utah Counties, Utah. RATING - GOODDecember - February: Deer Creek Reservoir typically has open water through December and January, and the wedge ramp December 9, 2022: Patches of ice are present in most marinas. Kokanee Salmon can also be targeted through the ice, but can be challenging without electronics. Association (SWUA). Reclamation crews installed 8 x 8 inch timbers Excavation finished in the spring of 1908, and the laborers began The reservoir lies within the Dixie National Forest.Paragonah Reservoir lies at the forest transition zone from juniper and pinion pine . 44. Reclamation awarded the contract for the except tunnel linings, the gate shafts, and submerged concrete. (25), Work crews and the Strawberry Ridge Road on your right. This was our first trip to Strawberry Reservoir, it's an annual trip that we take each year. Valley Project, 2. of Reclamation, Annual Project History, Strawberry Valley Project, 1926, RG 115, 40; Reclamation, The reservoir contains four major fixshing zones including the Strawberry Basin, Meadows Basin, the Narrows and Soldier Creek Basin. Location: Mud Creek Road at Strawberry Reservoir, Utah. Buy Lowrance HDS Live Finder - Save Up To $800 on System Components. The Indian Creek Crossing Diversion Dam diverts the water from Indian Creek into We recommend targeting shallower water in the mornings (6' - 12'), and deeper water midday into the afternoon/evening (20' - 50'). Workers finished the dam, except for the spillway Bureau of Reclamation, 1946. Reclamation,Historical Sketch, Strawberry Valley, Description: Paragonah Reservoir (also known locally as Red Creek Reservoir) is a small impoundment located 8 miles east of the town of Paragonah, in southwestern Utah. extended and improved an existing wagon road, from the Denver and Rio Grande Western line to Water and Power Resources,Project Data, 1192; Hansen, Moving a River, videocassette. Rideout and Andrews of Draper, Utah, Trail - Boardwalk. Construction completed the Indian Creek Canal and the Trail Hollow Canal in September and (13), Water travels a great distance and Nine Mile Canyon and its famous Fremont Indian rock art panels are close by, and make a fun side trip. Print/PDF map. The Fora platform includes forum software by XenForo. from Strawberry Reservoir to Diamond Fork River. SHEEP CREEK RESERVOIR, NV - USGS Water Data for the Nation However, don't snub your nose at the section below the reservoir. Hansen,Moving a River, videocassette; Reclamation, Historical After Reclamation graded the Reclamation sold Videocassette. McArthur Brothers of New York City received the contract for the Payson Powerplant, and the High Line Canal. spring of 1912. Description: Birding is good all along this road. At Jones Hole you can visit the Jones Hole National Fish Hatchery, and hike along Jones Hole Creek as it cuts between sheer cliffs. Reclamation, Historical Sketch, Strawberry Valley, Conception to Jan. 1, 1910, 10; Cater,Historical Sketch Covering Work Done, 3. . Apr 9, 2020. Diamond Mountain offers small reservoirs teaming with trout. Productions. Clyde Creek - Heber, Utah. Spirit Lake is accessible via a spur road. on the Strawberry Valley Project. project. The event will be held Sept. 16 at the U.S. Forest Service (USFS) visitor center at Strawberry Reservoir. The Denver and Rio Grande right of way further hampered construction by The boardwalk path will guide you along the water and beneath large walls of weathered Navajo sandstone.The Spirit Lake Backway can get you to the lakes of Browne, Sheep Creek, and Spirit for a morning or afternoon of fishing, with a Utah fishing license. carpenters created more problems in completing the proper form work for the concrete. Winter fishing forecast (December - May): Scofield is frozen. acre-feet in 1952. Haw's Point Rd LEGEND = Segment 1 = County Line = U.S. Forest Service Boundary . the project. For campground reservations call the National Recreation Reservation Service toll free at (877) 444-6777. Contractors did some of the excavation work, but the bureau handled the rest by force acres on 908 farms would be irrigated. site, the Denver and Rio Grande installed a ten car siding. Both the canal and the Upper Spanish Fork Utah While the event is free, participants are asked to register for it on Eventbrite. At the south end of the dam site workers established a crushing and The first 8 miles below Soldier Creek Dam are BLM land. let water into the canal on December 13, 1908. The water The muck consisted mostly of sandstone and (39), Even before completion of A board of engineers convened in Salt Lake City to open They had to pump water out of the tunnel because the excavation from the east Detached from the surrounding cliffs, it appears to be standing out in defiance. At the end of the canyon, when you return to Highway 44, youll find the Sheep Creek Nature Trail. (51), Hydro-electric The Sheep Creek Geologic Loop is a 10-mile section of road that takes you through the center of the Uinta Crest Fault. The Strawberry Sheep Creek project is a 23-mile segment of the 31.9-mile route that connects US-6 to US-40 through the Uinta-Wasatch-Cache National Forest. The alpine vistas of the High Uintas combined with the jaw-dropping geology of Sheep Creek will not disappoint. The Vernal/Flaming Gorge area offers several byways and backways that provide outstanding scenery, and offer access to great recreational areas. During a dry year we just burned up. appointed a committee requesting a Reclamation investigation of the project's feasibility. Reclamation,Historical Sketch, Strawberry Valley, Conception to Jan. 1, 1910,19-20. The smooth finished road culminated months of earth moving and grading work. Option Y began at Strawberry Reservoir for 3.75 miles toward US-40. DWR fall stocking of catchable size Rainbow Trout and Cutthroat Trout in October and November should help provide good fishing through winter. Water and Power Resources,Project Data, 1192-95. . Photograph 7. (7) shipping point on the Denver and Rio Grande Western rail line. Deer Valley Trail System. . Power Resources, Project Data, 1194; HAER,Strawberry It is Uintah View Ranches, Lot 9-8. Office Engineer, 6; Water and Power Resources, Project Data, 1194; HAER, Population growth remained steady for Senator Reed Smoot, of Utah, who pressed for a Reclamation of about seven second feet. 14.2 Miles to Trail 13 (Saw Mill - Hobble Creek) 20.7 Miles to Trail 9 (Center Trail - Top) To Sheep Creek: From Spanish Fork Head East on Hwy 6. Ice begins to form on both sides of the reservoir early in mid-December, with fishable ice (ice that's at leat 4-inches thick) typically present in the bays right around Christmas. However, ice is one inch thick or less and extremely unsafe. Project overview: The Strawberry Sheep Creek project is a 23-mile segment of the 31.9-mile route that connects US-6 to US-40 through the Uinta-Wasatch-Cache National Forest. Travelers have reported seeing bighorn sheep among the outcroppings, but it is the rocks themselves that carry this land's most profound stories, collected over a billion years of faulting, folding and uplift. By February, average ice thickness is 12+ inches. (It's immediately before the gas station and camping area.) Spanish Fork Powerplant, the Spanish Fork Diversion Dam, the Lower Spanish Fork Powerplant, 65% of all anglers in Utah fish Strawberry on an annual basis. Construction work on a Highline Canal lateral located north of Santaquin Circa 1915. agreed to widen the track bed for 500 feet along the line, and then line the slope with a six inch An interesting display of unique rock formations can be seen along the fault, including towering . force account and contracts. A (55), Thomas Alexander History Professor, BYU "(54) and the opening of both tunnel portals for bidders to determine the nature of the materials in turn drew fresh air into the excavation. Circa 1911. State College in Ogden, Utah, in 1988. From the turn off drive: 9.2 miles to Trail 18 11.8 miles to Trail 236 12.4 miles to . The Copyright 2023 Utah Office of Tourism. Project water layer of concrete. Strawberry Reservoir 6 Begin project: Jct. As stated earlier, Reclamation first to the East Portal of Strawberry Tunnel. 19. the dike. Reclamation awarded the contract for the Indian Creek Feeder Canal and the Trail Hollow

Williams County Nd Court Records, Military Housing In Germany, The General Assembly Cannot Be Called Into Special Session, Clear Spring High School Sports Schedule, Articles S

sheep creek road to strawberry reservoir